Originally posted by c751bLoVuR:JM!! Coz she annouced the terminal station of the line!
=================
Welcome to train forum!
yeah
but I think CHY did mentioned something like
CC13 Serangoon Interchange
Passengers who are continuing their journey towards HabourFront interchange or Pungol, please alight.
CC13 Serangoon Interchange
Originally posted by d143b2:yeah
but I think CHY did mentioned something like
CC13 Serangoon Interchange
Passengers who are continuing their journey towards HabourFront interchange or Pungol, please alight.
CC13 Serangoon Interchange
Only the driverless train...... :(
:D
Actually right, There are two control stations for each station for CCL.
1 is @ Kim Chuan Depot (For Whole Line)
2 is @ Station office
LOL That time i walk pass the Dhoby Ghaut CCL Station Office, only the station master was there, he went to take a cup of coffee, then on the screen there was like 2 parallel tracks, 1 scissors switch, all green (meaning no train) lol. For NSL and EWL, they have 2 or 3 ppl right? for Dhoby Ghaut only gt 1 lol.
This chugga(train) is ready to depart.
Originally posted by Kawac151:This chugga(train) is ready to depart.
+ the Money Train..
Next station, Eunos.....
Bravia ad train on CGL now...
021/022 looks plain now.
Originally posted by c751bLoVuR:Bravia ad train on CGL now...
Who spotted it? Or is it just your imagination?
CGL trains today are 223/224 and 227/228 as spotted in the morning.
Originally posted by jcqh:Who spotted it? Or is it just your imagination?
CGL trains today are 223/224 and 227/228 as spotted in the morning.
Not real lar........... Just spamming in this chatbox fake de..
Remember when train forum was fourth last wk, let's put the rank higher. Yellow pigments on the tracks.
Dun ever say a lie!!!
DTL 3 confirm to be constructed 50m above the ground as building it underground is too expensive!
Originally posted by Dragonaxe:DTL 3 confirm to be constructed 50m above the ground as building it underground is too expensive!
Wow, meaning that the C951s will be able to see the outside world, unlike the C830s and C751As
then now DTL is partly above ground like NSL and EWL?
Originally posted by Dragonaxe:DTL 3 confirm to be constructed 50m above the ground as building it underground is too expensive!
Any source? 50m above the ground is taller than a 12-floor HDB building.
Originally posted by Dragonaxe:DTL 3 confirm to be constructed 50m above the ground as building it underground is too expensive!
Sources please.
Otherwise I'd take this as an unreliable information.
Please provide a source.Otherwise how will we know that what you are saying is true.
Originally posted by Dragonaxe:DTL 3 confirm to be constructed 50m above the ground as building it underground is too expensive!
If DTL 3 confirmed to be constructed above 50m above ground, I tell you Singapore will have one million ERPs island wide, including Pulau Tekong, the seas and your house gate.
Originally posted by wenjie639:Any source? 50m above the ground is taller than a 12-floor HDB building.
Oh yea... I think the maximum height built (JKN side) was roughly 10m?
I just realised 50m is
NO FAIR!!! How come when everybody is new to the forum, they get a welcomt while i dun have.
Originally posted by Scania96:NO FAIR!!! How come when everybody is new to the forum, they get a welcomt while i dun have.
welcome aboard..
Originally posted by QX179R:welcome aboard..
lol. Thanks.
Originally posted by Scania96:NO FAIR!!! How come when everybody is new to the forum, they get a welcomt while i dun have.
Lol u aint the only one here without a WELCOME =D