Whatever the case, we can expect the next wave of new / amended services to be related to DTL3 opening.
- Possible new (137?) or amended (58?) services to Kaki Bukit Ave 2
- Amendment of 20 (perhaps 12 as well) to serve Somapah Rd & Expo MRT
- Other miscellaneous amendments
Possible new (137, 152 or amended (58,94) services to Kaki Bukit Ave 2
If 58 goes to kaki bukit ave 2, the connection from Eunos Link will be lost
new bustops along Kaki Bukit industrial estate.
saw one along Kaki Bukit Ave 3.
Originally posted by Ajen:new bustops along Kaki Bukit industrial estate.
saw one along Kaki Bukit Ave 3.
Saw at K.B ROAD 3 too.
Should be loop service around Kaki Bukit area as only one shelter constructed (at one side and not both sides of road).
Should be the feeder BUS SERVICE from eunos interchange to
Two weeks ago saw the bus service on test bus service route
Most probably loop around Kaki Bukit industrial estate & pass by Kaki Bukit MRT stn.
Originally posted by bus555:If 58 goes to kaki bukit ave 2, the connection from Eunos Link will be lost
besides that , the very first stretch of KB ave 2 from Eunos Link is always clusterfucked during peak hours. It may further screw up the frequency of bus 58 if it ever goes to ave 2.
Originally posted by kengkia:besides that , the very first stretch of KB ave 2 from Eunos Link is always clusterfucked during peak hours. It may further screw up the frequency of bus 58 if it ever goes to ave 2.
Kaki Bt industrial park is already clusterfucked even during off peak/lunch hours..
There is new bus stop at kaki bukit AVE 6 kaki bukit RD 5
Great news. I have proposed and hoped for a service there from the last 1 year.
Ideal route would be connecting CBP -> Tanah Merah -> Bedok North St 3 -> Bedok North MRT -> Kaki Bukit Industrial Estate -> UBI -> Macpherson -> Paya Lebar -> Geylang.
Originally posted by BusAnalayzer:Great news. I have proposed and hoped for a service there from the last 1 year.
Ideal route would be connecting CBP -> Tanah Merah -> Bedok North St 3 -> Bedok North MRT -> Kaki Bukit Industrial Estate -> UBI -> Macpherson -> Paya Lebar -> Geylang.
The route start from Sims Pl and loop around Kaki Bt Ind estates.
By the way,If service 48 terminate at CBP,Any idea on how a new CBP svc will cover the deleted 48 routes towards Bedok Depot and continued to loop somewhere?
Originally posted by carbikebus:The route start from Sims Pl and loop around Kaki Bt Ind estates.
By the way,If service 48 terminate at CBP,Any idea on how a new CBP svc will cover the deleted 48 routes towards Bedok Depot and continued to loop somewhere?
Depends on the new route that 48 takes ... though it would be very redundant seeing that CBP already has 47 which partially duplicates 48.
Any new route passing by BNDEP should ideally serve Bedok Reservoir / Bedok North / Simei MRT station. Preferrably the first one.
Originally posted by AJQZC:Depends on the new route that 48 takes ... though it would be very redundant seeing that CBP already has 47 which partially duplicates 48.
Any new route passing by BNDEP should ideally serve Bedok Reservoir / Bedok North / Simei MRT station. Preferrably the first one.
More buses,better rides.
Originally posted by TIB 585L:973 is redundant to the max. Fetch air only most of the time, waste manpower. Shld have extended to loop at Ng Teng Fong
973 has more demand now for petir road where 700 and 966 serves and the bt panjang rd sector which 184 700 serves, since 700 doesnt stop at the int. good move by lta to increase demand, saw 10 pax board 973 at bpbi few days ago at night
Originally posted by carbikebus:The route start from Sims Pl and loop around Kaki Bt Ind estates.
By the way,If service 48 terminate at CBP,Any idea on how a new CBP svc will cover the deleted 48 routes towards Bedok Depot and continued to loop somewhere?
48 can terminate at CBP now that it operates with DDs. 17A should be removed and 47 should be introduced to supplement svc 17 but connect to DTL3.
Bedok Interchange >> Bedok North St 1 (exp) >> Bedok North Ave 2 >> Bedok North St 3 >> Bedok North Ave 1 >> Bedok North Road (BDN MRT) >> Bedok Reservoir Road >> Bedok North Ave 3 (BDR MRT) >> Bedok North Road >> Bedok North Ave 4 >> ... >> Tanah Merah MRT (svc 48 route) >> Bedok South Ave 3 >> UEC Road >> Bayshore (loop)
* Connects Bedok North St 3 Estate to Bedok North MRT
* Connects Bedok Reservoir to Bedok North MRT
* Connects Bedok North Industrial estate and housing estate along ave 4 to Bedok Reservoir MRT
* Connects Bayshore to Tanah Merah MRT
Originally posted by BusAnalayzer:48 can terminate at CBP now that it operates with DDs. 17A should be removed and 47 should be introduced to supplement svc 17 but connect to DTL3.
Bedok Interchange >> Bedok North St 1 (exp) >> Bedok North Ave 2 >> Bedok North St 3 >> Bedok North Ave 1 >> Bedok North Road (BDN MRT) >> Bedok Reservoir Road >> Bedok North Ave 3 (BDR MRT) >> Bedok North Road >> Bedok North Ave 4 >> ... >> Tanah Merah MRT (svc 48 route) >> Bedok South Ave 3 >> UEC Road >> Bayshore (loop)
* Connects Bedok North St 3 Estate to Bedok North MRT
* Connects Bedok Reservoir to Bedok North MRT
* Connects Bedok North Industrial estate and housing estate along ave 4 to Bedok Reservoir MRT
* Connects Bayshore to Tanah Merah MRT
Sounds good, but could it be too winding?
Originally posted by BusAnalayzer:48 can terminate at CBP now that it operates with DDs. 17A should be removed and 47 should be introduced to supplement svc 17 but connect to DTL3.
Bedok Interchange >> Bedok North St 1 (exp) >> Bedok North Ave 2 >> Bedok North St 3 >> Bedok North Ave 1 >> Bedok North Road (BDN MRT) >> Bedok Reservoir Road >> Bedok North Ave 3 (BDR MRT) >> Bedok North Road >> Bedok North Ave 4 >> ... >> Tanah Merah MRT (svc 48 route) >> Bedok South Ave 3 >> UEC Road >> Bayshore (loop)
* Connects Bedok North St 3 Estate to Bedok North MRT
* Connects Bedok Reservoir to Bedok North MRT
* Connects Bedok North Industrial estate and housing estate along ave 4 to Bedok Reservoir MRT
* Connects Bayshore to Tanah Merah MRT
Way too winding in Bedok. Few will stay on board beyond five stops.
My alternative suggestion:
Originally posted by AJQZC:Way too winding in Bedok. Few will stay on board beyond five stops.
My alternative suggestion:
- - Extend 18 to Bedok North Ave 1, St 3 and Ave 2.
- - Amend 228 to serve Bedok North Rd, Ave 4 and beyond (could be UEC or CBP). Renumber and reclassify as trunk service. If need be, the other side can also be extended to loop around Kaki Bukit. 66 serves as backup service to Bedok Int.
- - Amend 168 to Bedok North Ave 2 to cover for 18's lost sectors. There's still 28 and 67 to Tampines, so not too troublesome.
This would be enough for most points-to-MRT links already.
True - but it is hub and spoke to connect to DTL3, and I wanted to connect Bedok North St 3 to DTL3.
Alternative is Eunos >> Sims Ave East >> Chai Chee Dr / St >> Bedok North Ave 1 >> Bedok North Road... and continues on my proposed route.
This change will connect Chai Chee to DTL3, but the connection for North St 3 is still missing.
Originally posted by BusAnalayzer:48 can terminate at CBP now that it operates with DDs. 17A should be removed and 47 should be introduced to supplement svc 17 but connect to DTL3.
Bedok Interchange >> Bedok North St 1 (exp) >> Bedok North Ave 2 >> Bedok North St 3 >> Bedok North Ave 1 >> Bedok North Road (BDN MRT) >> Bedok Reservoir Road >> Bedok North Ave 3 (BDR MRT) >> Bedok North Road >> Bedok North Ave 4 >> ... >> Tanah Merah MRT (svc 48 route) >> Bedok South Ave 3 >> UEC Road >> Bayshore (loop)
* Connects Bedok North St 3 Estate to Bedok North MRT
* Connects Bedok Reservoir to Bedok North MRT
* Connects Bedok North Industrial estate and housing estate along ave 4 to Bedok Reservoir MRT
* Connects Bayshore to Tanah Merah MRT
47 alr used
New bus Stops at Kaki Bukit
24 September 2017 Tap In Tap Out 0 Comment
Several new bus stops have been spotted in the Kaki Bukit area, intended for an upcoming bus service likely plying between Sims Place and Upper East Coast. These bus stops and their future bus service(s) will bring about greater connectivity to the Kaki Bukit Industrial Estate which presently does not have bus connections north of Kaki Bukit Avenue 1.
The following six pairs of bus stops were spotted:
Kaki Bukit Road 5
New bus stop pair under construction outside PUB Bedok Waterworks.
Kaki Bukit Avenue 6
New bus stop pair under construction outsideAutoBay@Kaki Bukit.
Kaki Bukit Road 5: New Bus Stops under construction
Kaki Bukit Avenue 6: New Bus Stops under construction
Kaki Bukit Avenue 3
Two pairs of bus stops are under construction underneath the flyover. One pair outside Bartley Biz Centre, the other pair outside Techview.
Kaki Bukit Avenue 3: New Bus Stops under construction
Kaki Bukit Avenue 3: New Bus Stops under construction
Kaki Bukit Road 3
New bus stop pair under construction outside Empire Technocentre.
Kaki Bukit Avenue 2
New bus stop pair under construction outside Kaki Bukit Autohub.
Kaki Bukit Road 3: New Bus Stops under construction
Kaki Bukit Ave 2: New Bus Stops under construction
The locations of the new bus stops are reflected
|
Got 1 pair of bus stops under construction along Tampines St 82
Think there is a new bus stop shelter at Tampines ST 86 (Blk 879B).
BSEP : New bus services 137, 298 from 21 Oct 2017. New release on LTA Facebook.
new services 137 & 298 from 21 oct
amendment to 18,20,118,293
info from LTA FB
so the last 80th service is 71 ? haha