Originally posted by SBS3004X:Bukit Panjang ITH is a real joke. 24 lots and only 1 alighting berth?
Originally posted by SMB5007J:even if you want more than 24 lots there won't be any space also... don't make a joke out of urself
In this case, I don't think his statement about having only 1 alighting berth is wrong. If that's the case, imagine the snaking queue of buses waiting to alight passengers. I am sure they would have planned it better.
Originally posted by SMB5007J:even if you want more than 24 lots there won't be any space also... don't make a joke out of urself
There should be 30 lots. 24 lots is exactly 2 lots per service, which may not be enough for peak hours.
And if I remember correctly, someone said there was only 1 alighting berth. Can anyone confirm that? It doesn't make any sense.
pretty sure there will be another bus stop meant for alighting closer to bpj lrt just like before it closed for upgrading to ith. anyways if i remember correctly, the former also had like less than 30 lots only...
2 alighting berth la dey,Imagine 1 alighting berth with bendy buses?Yes,There is 28 designated lots but also can park a few buses at the side.LTA nowadays very smart..Making BCs life like hell.
Originally posted by TIB 585L:no wonder they cut down alot of OTs lol
Been hearing shift start at 9pm end at midnight. 5pm end at 1am
5am end at 12.30pm
Good lor,I would like to drive this type of duty..Less headache
Originally posted by carbikebus:Good lor,I would like to drive this type of duty..Less headache
Originally posted by TIB 585L:
But split shifter like jialat leh. Less break. Start at 7am end at 4pm. go back depot and then PM shift takeover
Same like GA,Now split shift like shit,Less break and drag until 8.30-9 pm,Stupid rosters at its best.
Originally posted by TIB 585L:Those S1 shift in SMRT end late. Those S2 ends very early aka Extended shift end early
All i can say is shitty..
All, the temp changi bus park is closed down with effect from 10 dec 2016. It will be demolished and will make way for the new changi depot. Cheers. Thanks.
Originally posted by dupdup77:All, the temp changi bus park is closed down with effect from 10 dec 2016. It will be demolished and will make way for the new changi depot. Cheers. Thanks.
So move back to BNDEP totally.
7 years later, it will be brought back, same number of bus services.
Originally posted by dupdup77:All, the temp changi bus park is closed down with effect from 10 dec 2016. It will be demolished and will make way for the new changi depot. Cheers. Thanks.
And Bedok and Tampines overnight parking still continued
Originally posted by dupdup77:All, the temp changi bus park is closed down with effect from 10 dec 2016. It will be demolished and will make way for the new changi depot. Cheers. Thanks.
You mean ECDEP? Will it be used for Bedok or Tampines contract?
Originally posted by iveco:You mean ECDEP? Will it be used for Bedok or Tampines contract?
More to Tampines and Changi Business Park package,Bedok and Upp East Coast will be under Bndep.
Originally posted by iveco:You mean ECDEP? Will it be used for Bedok or Tampines contract?
Hi mr iveco, yes the current changi bus park will be demolished soon. It will be closed down on 10 dec to build the East Coast integrated depot which is a multi storey depot housing east-west, downtown, Thomson-east coast mrt lines. It will also house a new multi storey changi bus depot. This east coast intregrated depot was announced sometimes way back earlier this year. Cheers. Thanks.
Originally posted by dupdup77:All, the temp changi bus park is closed down with effect from 10 dec 2016. It will be demolished and will make way for the new changi depot. Cheers. Thanks.
The replacement depot will be .........
Anyway HGDEP is undergoing expansion which will be completed by end 2017. The size will be increased by almost 100%.
Originally posted by lemon1974:Anyway HGDEP is undergoing expansion which will be completed by end 2017. The size will be increased by almost 100%.
That means Kim Chuan won't be built? i always assumed Seramgoon contract will be based at Kim Chuan.
Originally posted by lemon1974:The replacement depot will be .........
Originally posted by iveco:That means Kim Chuan won't be built? i always assumed Seramgoon contract will be based at Kim Chuan.
I think Kim Chuan will be for Serangoon/Eunos while Hgdep for Hougang and NorthEast
https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=4a00b2c7-f57e-459a-a1db-f802413fbb6c
Opening of Tampines Concourse Interchange
- Svc 127 will be controlled by BNDEP
- What about Svc 129? BNDEP/BRBP or BNDEP/AMDEP?
Originally posted by Sbs6750E:
BNDEP.
If there is space in BNDEP now, what for those Tampines interchange buses are still parking at CGBP overnight ? too much diesel?
Originally posted by carbikebus:I think Kim Chuan will be for Serangoon/Eunos while Hgdep for Hougang and NorthEast
yes correct.... the sengkang/hougang package will start in 5 years time..