Originally posted by SBS3004X:When new operator in Sengkang/Punggol starts service, Tampines can go to Loyang package.
Unless there is a new depot along Sengkang/Punggol corridors since LTA have plan to built Buangkok Int in future..
It would be good if the government can build a new bus depot at Depot Road, and call that depot "Depot depot".
there's some space at the junction of Depot Road and Alexandra Road. maybe can build bus depot there. LOL.
because currently, there's no depot at Depot Road. Calling it "depot road" does not seem appropriate. Should instead call it "army road", since CMPB is there.
combaobao
For the record,
Serangoon Bus Interchange
- 1 entry & 1 exit, with 2 lanes each.
- 2 alighting berths.
- 3 boarding berths.
- 17 parking lots.
since when LTA plan to bulid a buangkok ITH?
Originally posted by gekpohboy:For the record,
Serangoon Bus Interchange
- 1 entry & 1 exit, with 2 lanes each.
- 2 alighting berths.
- 3 boarding berths.
- 17 parking lots.
Seriously LTA should built more parking lots for the new interchanges..Not all service use 2 lots especially the high capacity feeders.
Serangoon need at least 19-21 lots to be safe..
100=2 lots,101=2 lots,103=2 lots,105=3 lots,109=3 lots,158=2 lots
315=3 lots and 317=2 lots..19 lots and 1-2 spare lots.
Originally posted by carbikebus:Serangoon need at least 19-21 lots to be safe..
100=2 lots,101=2 lots,103=2 lots,105=3 lots,109=3 lots,158=2 lots
315=3 lots and 317=2 lots..19 lots and 1-2 spare lots.
Serangoon has odd-number lots: 17, instead of 16, for 8 bus services.
I guess the 1 extra lot is meant to provide that "third parking lot" during peak hours...
...
Originally posted by carbikebus:Seriously LTA should built more parking lots for the new interchanges..Not all service use 2 lots especially the high capacity feeders.
did you count the spare lots at the side because im sure theres arnd 20
17 designated...Side can park 2-3 buses illegally
Originally posted by TIB987K:
Or for the full PDF: https://www.ura.gov.sg/sales/JelebuPetirRd/Launch/tenderdocs/JelebuPetirRd-Schedule1.pdf
So what I think is: 75, 176, 180, 184, 700/700A, 920, 922, 970, 972, 975, 979/979M, 983.
Bukit Panjang Bus Interchange.
177 and 983 will loop at Bukit Panjang.
75, 176, 180, 184, 700, 920, 922, 970, 971E, 972, 975, 979 will use the interchange.
No provision for new route.
Trust me.
Bukit Panjang Bus Interchange
will have 22 bus parking lot
3 or 4 Boarding Berth
3 arriving bay
LTA is going to rebuilt CCK interchange.....
All, sengkang extension bus interchange is completed. Waiting for official opening announcement and bus operations to begin with. Anytime soon! Get ready guys! Cheers. Thanks.
Originally posted by dupdup77:All, sengkang extension bus interchange is completed. Waiting for official opening announcement and bus operations to begin with. Anytime soon! Get ready guys! Cheers. Thanks.
Originally posted by Sbs6750E:
it's about time. Initially LTA say complete by 3Q 2015. Sengkang residents have been waiting patiently for the extension to complete.
Hi mr sbs6750E, they delayed the start of the expansion for sengkang interchange. Naturally the completion will be delayed as well. Anyway, it is coming really soon. At least compass one mall is opening on 1 sept 2016. Just 3 more days. Renovation is completed finally. Hooray.
Seletar Bus Depot | SMB5072U On 969 Via SLE | 270816
Concrete slabs (floors) under construction at the north of the depot / next to SLE.
(2 days late | Sorry, no image)
Yishun Bus Interchange (Temporary)
- 2 entry and 2 exit, with 1 lane each.
- approximately 2 to 3 alighting berths.
- 8 boarding berths.
- 48 parking lots.
Originally posted by TIB987K:Seletar Bus Depot | SMB5072U On 969 Via SLE | 270816
Concrete slabs (floors) under construction at the north of the depot / next to SLE.(2 days late | Sorry, no image)
As usual,SMRT is the opening ceremony operator after Bulim and Loyang.
Originally posted by dupdup77:Hi mr sbs6750E, they delayed the start of the expansion for sengkang interchange. Naturally the completion will be delayed as well. Anyway, it is coming really soon. At least compass one mall is opening on 1 sept 2016. Just 3 more days. Renovation is completed finally. Hooray.
Haven't you learn from Punggol Waterway, that not all stores are ready when the mall opens? Nonetheless, there will definitely be discounts... anticipating it. :)
Originally posted by gekpohboy:Haven't you learn from Punggol Waterway, that not all stores are ready when the mall opens? Nonetheless, there will definitely be discounts... anticipating it. :)
Hi mr gekpohboy, so? There is no linkage in the statement you made. What I mean is renovation of compass one mall as a whole. I do not mean the individual stores to complete renovation. I also don't anticipate 100% of stores to be open. Take note compass one is only 95% tenanted. Currently waterway point is also not 100% tenanted. There are still several empty stores and the water playground is still ongoing renovation. Cheers. Thanks.
Originally posted by gekpohboy:Yishun Bus Interchange (Temporary)
- 2 entry and 2 exit, with 1 lane each.
- approximately 2 to 3 alighting berths.
- 8 boarding berths.
- 48 parking lots.
Yishun has 48 parking lots, that means it can accomodate up to 24 bus services.
Currently, there are 22 public bus services at Yishun and 2 private bus services.
46 lots are used, left 2 lots not used yet.
Yishun can have one more bus service.