Exposed to e public riao.
LTA is planning to house the S'goon Ave 2 bus stop pair Blk 334/ Opp Blk 334 into a bus bay.
As for the bus interchange, it's likely to see left turning into interchange (no pedestrain crossing, overhead bridge built).
Wun be surprised tat there's right turning in lieu of the bus stop bay built.
I pity those residents living in blocks 330 to 335. Going to be crowded and noisy in future, especially with the new shopping mall.
When u live near the interchange, you wanted convenience, so you cannot complain noisy.
One more place for shopping in future!
JE Int oso gonna be rebuilt somewhere next year..
Did SBST say when they are going to transfer the interchange?
Originally posted by SBS7322B:Did SBST say when they are going to transfer the interchange?
should be integrated with the new shopping ctr..
I think e shopping mall will only be up in December
Novemeber think difficult riao unless fitting works for indv shops are ongoing together.
Think fastest would be the week before school starts
Originally posted by sbst275:I think e shopping mall will only be up in December
Novemeber think difficult riao unless fitting works for indv shops are ongoing together.
Think fastest would be the week before school starts
if I take svc 45, sure got pass by the new shopping mall..
looks almost completed..
Originally posted by QX179R:if I take svc 45, sure got pass by the new shopping mall..
looks almost completed..
Bus Int door still not installed, basement 3 still not ready yet.
Bus stop bay not done yet, outside road still on works.
Overhead bridge almost complete le.
Bus Int is really very small
Services 100, 105, 109 high chance going WAB once the new interchange is ready.
Originally posted by QX179R:if I take svc 45, sure got pass by the new shopping mall..
looks almost completed..
The shopping centre will be up by end November.
Someone correct me if I'm wrong...
Sgoon Avenue 2 seems like a small road. If the Nex Mall is a bus interchange, wouldn't
then what would happen to the current interchange? become another carpark like hougang south?
Serangoon Ave 2 has 2 lanes on each side. Traffic generally not very heavy.... most services in Serangoon has poor/average frequencies anyway, and many services dont get much boarding activites there.. like 81 82 101 103 ie. those affected by NEL in 2004
as for the current interchange, best economic sense will be to sell the land and build a mid-end condominium
Originally posted by 105090:
as for the current interchange, best economic sense will be to sell the land and build a mid-end condominium
sell sell sell!!
The problem now is the routing
105 will be the most problematic
Originally posted by sbst275:The problem now is the routing
105 will be the most problematic
I fully agree with you. 105 goes through Boundary Rd and turns into S'goon Ave 2... If the new interchange is there then it'll be very difficult.
Erm.. .Routing problem also for 315... unless go straight to S'goon Ave 2 from Lor Chuan?
nothing wrong with using serangoon central, then to upp serangoon and right to ave 2.
Originally posted by Pitot:nothing wrong with using serangoon central, then to upp serangoon and right to ave 2.
It's also the traffic flow.
You do have Sv 45, 58, 133, 135 using S'goon Ave 2 as well. Their combi AM peak trips is 23 trips (towards Lor Chuan), (24 towards Upp S'goon Rd).
What I've been thinking of is this:
Sv 81, 82, 103: Straight from Upp S'goon Rd into S'goon Ave 2, bypass S'goon Ctrl totally.
Sv 105, 315: Like what you mentioned, make a detour.
Sv 100: Maybe make a detour via town centre first.
As for Sv 101, 109, 158 & 317 can't think of anything yet.
Originally posted by SBS 9256 X:Erm.. .Routing problem also for 315... unless go straight to S'goon Ave 2 from Lor Chuan?
dun think it's viable
town centre no linkage, then no access pt to NEL to town.
I take it tat NEL takes priority over CCL as it goes to main parts of CBD
comes to berthing issue
3 boarding berths and there's 81, 82, 100, 101, 103, 103M, 105, 109, 158, 315, 317.
So let's put it
Gp 1: 100, 101, 317. Approx 22 trips.
Gp 2: 81, 105, 103, 103M. Approx 21 trips.
Gp 3: 82, 109, 158, 315. Approx 23 trips.
Turnaround time gotta be within 2.5 mins wo
If i'm not wrong it's opening next year january i think so with Clementi..Clementi also almost done.